Roberts Wastewater Treatment Plant

  • Location: Roberts, ID
  • Owner: City of Roberts, Idaho
  • General Contractor: TBP Construction
  • Technique(s) Utilized: Vibro Stone Columns
  • Subsurface Conditions: Silty Sand
  • Approximate Key Quantities: Stone Colums - 150, Stone Column Depth - 24 feet, Stone Column Diameter - 24 inches

Background

Nicholson provided ground improvement for the construction of a new wastewater treatment plant in Roberts, ID. To mitigate liquefaction and reduce settlement, Nicholson installed 150 stone columns to a maximum depth of 24 feet using dry-bottom-feed methods. With the dry-bottom-feed method, the vibroprobe is inserted into the ground and penetrates to the target depth under its own weight and compressed air jetting.

The stone columns were installed using a Vibro Stitcher, which is a vibroprobe mounted on a conventional excavator. The Stitcher system offers flexibility when working on busy, congested sites and is less expensive to mobilize compared to a crane-mounted vibroprobe.